Pavillon is located outside the North Carolina community of Sunny View. We’re just a few miles south of the popular vacation destinations of Lake Lure and Chimney Rock in Western North Carolina.

Our campus address is:

241 Pavillon Place
Mill Spring, NC 28756

Driving to Pavillon from South Carolina: 

Take I-26 West into North Carolina.
First exit in North Carolina is Hwy 108 (NC Exit 67). Turn right onto Hwy 108 East.
Travel 5 miles to Hwy 9. Turn left onto Hwy 9 North.
Travel 6 miles to Coopers Gap Road.
Turn left onto Cooper’s Gap Road.
Travel 1-3/4 miles to Lake Adger Road.
Turn left onto Lake Adger Road.
Travel 1/4 mile to Pavillon Place.
Turn left onto Pavillon Place. Come around toward the left to the front of the building.

Driving to Pavillon from Points East: 

Travel West on I-40 to Hwy 221 (exit 85). Turn left onto Hwy 221 South.
Travel 20 miles on Hwy 221 (through Rutherfordton) to Hwy 108 (CVS/Amoco on the corner).
Turn right onto Hwy 108 West.
Travel 13.7 miles to Hwy 9. Turn right into Hwy 9 North.
Travel 6 miles to Coopers Gap Road. Turn left onto Cooper’s Gap Road.
Travel 2 miles to Lake Adger Road. Turn left onto Lake Adger Road.
Travel 1/4 mile to Pavillon Place. Turn left onto Pavillon Place.

Driving to Pavillon from Points West: 

Travel East on I-26 to Hwy US 74 E (exit 67) toward NC-108/Columbus/Rutherfordton. Merge onto US-74E.
Take the NC-108 exit, Exit 163, toward Mill Spring.
Turn left onto NC-108.
Travel to light at intersection of Hwy 108 & Hwy 9. Turn left onto Hwy 9
Travel 6 miles to Coopers Gap Road. Turn left onto Cooper’s Gap Road.
Travel 2 miles to Lake Adger Road. Turn left onto Lake Adger Road.
Travel 1/4 mile to Pavillon Main Entrance. Turn left onto Pavillon. Turn left to Admissions Entrance.

Traveling by Plane? 

Reservations should be made to Greenville/Spartanburg, South Carolina (GSP).

Friday Pavillon Update:

Pavillon friends and Colleagues,
We have POWER at Pavillon! The power came on late yesterday afternoon.
Now begins the process of restoring all of our internal systems, and anxiously awaiting internet and communication services.
Our Facilities’ staff are on the campus assessing needs for critical resources such as water, the wastewater system, and our Chiller which provides our air conditioning and heat.
Outside resource agencies for these systems have been notified in anticipation of the completion of restoration and obtaining approval as required for these services prior to bringing patients back to campus.
The timeline for re-opening is soon, although we do not have an exact date. We hope that it will be next week, pending any unforeseen challenges. Time will tell.
In the meantime, please do not come to the campus. We will keep you informed of our progress through these updates, including when the campus is open to staff and then to our patients.
Stay safe and stay tuned for future updates. Please share with others who may have limited access to communication venues.

In gratitude,
Barbara Bennett, CEO